PEQUIVEN: Modernization Project for the 480V Motor Control Center at the Olefins I Plant
2022. Venezuela
Replacement Engineering: Technical disassembly of existing equipment and cell adaptation for new technology.
Supply and Installation of Withdrawable Drawers: Provision of fifty-three (53) functional units (NEMA 1 to NEMA 5), equipped with molded case circuit breakers and motor starters.
Intelligent Protection and Control: Advanced configuration of Schneider Electric TeSys relays for the thermal and electrical management of industrial motors.
High-End Components: Supply of thermomagnetic circuit breakers of various capacities and high-visibility LED signaling systems.
Quality Assurance Protocols: Exhaustive execution of Factory Acceptance Tests (FAT), Site Acceptance Tests (SAT), commissioning, and official system startup.
Proyelec provided its detailed engineering capacity to execute a flawless technological transition in a highly demanding industrial environment. Specialization in the configuration of Schneider Electric protection devices allowed the Olefins I plant to have a robust, efficient control system aligned with international safety standards.