PEQUIVEN: Modernization of Rectifiers and Battery Bank for the Chlor-Alkali Plant
2021. Venezuela
Technical Decommissioning: Safe de-installation and removal of existing power equipment and battery banks on-site.
Equipment Supply and Logistics: Provision and specialized transport of four (4) rectification units of 240 Vac / 25 A.
VRLA Storage Systems: Installation of 12V / 75 AH battery banks with valve-regulated lead-acid technology, guaranteeing maintenance-free backup and high reliability.
Installation and Configuration: Electromechanical assembly and adjustment of connections for the integration of the new systems into the plant network.
Commissioning and Load Testing: Operational validation of the system to certify immediate response to fluctuations in the main supply.
The technical intervention at the Chlor-Soda Plant ensures impeccable energy management, where precise rectification and the robustness of the VRLA battery banks minimize the risk of unscheduled downtime.