MAUREL&PROM Turbine Exciter Maintenance (TG A-15AA)

2023. Venezuela

The project consisted of specialized technical intervention for the restoration of the Distributed Control System (DCS) of the Chlor-Soda Plant. Proyelec’s core objective was to restore full functionality to the system, ensuring the operational continuity of the chemical process through the modernization of its critical components.

The technical execution allowed for a transparent technological transition, preserving the original plant architecture while elevating response and supervision standards.

The comprehensive system update was broken down into the following lines of action:

Control Hardware Modernization: Upgrade of process servers, operation consoles, and high-resolution monitoring screens to improve the Human-Machine Interface (HMI).

Software and Licensing Management: Advanced configuration of the control operating system and management of necessary licenses to ensure legality and technical support for the DCS.

Connectivity Infrastructure Optimization: Replacement and adaptation of communication and data cabling to guarantee interference-free signal transmission.

Critical Power Backup: Installation and startup of Uninterruptible Power Systems (UPS), ensuring control integrity against any power supply events.

Through this restoration, Proyelec succeeded in revitalizing the operational brain of the Chlor-Soda Plant, integrating cutting-edge technologies without altering the established process logic. By using specialized resources and precise planning, the company guaranteed a reliable solution that minimizes downtime and boosts the efficiency of the industrial infrastructure.

Related Projects